Muy Grande Solar
ERCOT queue ID 28INR0043
| Queue ID | 28INR0043 |
|---|---|
| Project name | Muy Grande Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Cruce - Del Sol |
| Point of interconnection | Tap 345kV 80079 Cruce - 80355 Del Sol |
| County | Starr |
| State | TX |
| Voltage | 345 kV |
| Capacity | 502.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2029-05-15 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | ACE DevCo NC, LLC |
|---|---|
| Cdr Zone | SOUTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Screening Study Complete | 45391 |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.